It takes real time and energy to prepare a bid submission. It can mean late nights on top of running your own business, or long hours and extra responsibility added to your already full role in an organisation. You might feel anxious facing the submission deadline, or vulnerable answering the questions candidly.
When you put so much into a submission, it’s understandably disappointing if you find out that you haven’t been successful. But it’s a real tragedy if your submission wasn’t rejected on pricing, quality, or capability, but instead because it didn’t meet some basic compliance requirements. Compliance requirements are non-negotiable in a bid submission. While following them won’t win you an opportunity, it’s the easiest way to make sure you won’t lose it.
Below, we described several common mistakes that we see time and again as tender professional. The good news is that they’re usually quite simple process issues. We explain how to fix them, and have included a short checklist you can run against your own submissions before you go anywhere near the ‘submit’ button.
7 Common Mistakes (and How to Fix Them)
Mistake 1: Missing or expired compliance documents
The single biggest cause of early rejection is failing to meet mandatory requirements. These are the non-negotiable, baseline terms of entry, and are usually flagged in Request for Tender (RFT) documents with words like ‘must’, ‘shall’, or ‘should’. These are often documents like insurances, licences, or certifications you or your business holds. Mandatory criteria are assessed as pass/fail before anything else is considered. Miss one, and the rest of your submission often won’t be scored at all, no matter how strong it is.
How to fix it: Build a standard compliance register listing every insurance, licence, and certification you and/or your business holds, along with expiry dates. Check your register against the RFT’s exact requirements before you submit anything. And don’t just do this from memory, but re-read the mandatory conditions carefully, line by line, every time. Do a key word search across all RFT documents for anything that indicates a mandatory requirement.
Quick check! Have you confirmed:
- Public liability and professional indemnity insurance are current and meet the required coverage level?
- Workers’ compensation evidence is included, and matches your state’s requirements for your business structure?
- Any required certifications (ISO standards, trade licences, WHS accreditations) are valid and not close to expiry during the contract term?
- Every mandatory compliance document listed in the RFT is actually attached, not just referenced?
This is also the clearest argument for staying ‘bid ready’ outside of any live tender. Keep documents like insurances, certifications, and licences current and easy to access at all times, rather than scrambling to renew or locate them the moment an opportunity appears.
Mistake 2: Ignoring formatting requirements
Non-compliance against formatting requirements is a genuine and common reason submissions are rejected or marked down. If you submit a ten-page response against a two-page limit, your submission can be disqualified outright, regardless of how great the content might be. And while it might seem insignificant, ignoring a font or file format specified in the tender documents suggests to an evaluator that you might be careless about details, or even arrogant and dismissive.
These mandatory requirements are, again, usually flagged in RFT documents with words like ‘must’, ‘shall’, ‘must not’, or ‘do not’.
How to fix it: Check the RFT documents carefully for any file or formatting requirements before you start preparing your responses. Treat formatting as its own dedicated check, separate from a content review, and do it as one of your last steps, right before submission.
Quick check! Have you confirmed:
- Your submission is within the stated page or word limit for every question or section?
- The font style, font size, and margins you’ve used match what’s specified in the RFT?
- All required headings and section labels are present and correctly ordered?
- The file type, naming convention, and number of attachments match the lodgement instructions exactly?
Mistake 3: Not answering the actual question
Evaluators score your submission on how clearly and directly you answer the specific questions and evaluation criterion in the tender, not on how impressive your business sounds in general. A common mistake is opening a response with a description of your company’s history or generic claims about quality, rather than a direct answer to the actual question.
How to fix it: Open every response with a direct answer to the specific question, before you add supporting detail. If a criterion asks you to demonstrate experience, your first sentence should already be doing just that. Before you start writing, think carefully about what exactly the question is asking, and why that is important to the evaluator.
Quick check! Have you confirmed:
- Each of your responses opens with a direct answer to that specific criterion, not general background?
- Every claim you make is backed by specific evidence, like project names, dates, measurable outcomes?
- You haven’t buried a strong answer three paragraphs into a section where an evaluator, reading quickly, might miss it?
Mistake 4: Submitting generic, reused responses
Reusing large sections of a previous submission with minimal changes is tempting, especially when you’re bidding often. But evaluators can usually tell! Generic responses that don’t reference the specific buyer or requirements come across as low-effort, even when your underlying story and capability is genuinely strong.
How to fix it: Use templates and standard content for structure and efficiency, but make sure every piece of evidence and detail is tailored to the specific opportunity in front of you.
Quick check! Have you confirmed:
- The buyer’s name, project, and specific requirements are referenced throughout, and not just in the cover letter?
- Case studies and evidence are the most relevant available for this particular criterion, not just the most convenient to copy across?
- A colleague or reviewer who wasn’t involved in drafting would recognise this as tailored to this tender, not a recycled one?
Mistake 5: Leaving questions blank
If a section genuinely doesn’t apply to your business, leaving it blank might be tempting, but it can look you’ve forgotten to answer the question or that you’re disengaged. Evaluators are looking for evidence that you’ve engaged with the entire document and request. It can also be tempting to just write ‘N/A’ and move on, but that can also seem disengaged.
How to fix it: If a question doesn’t apply to you, say so directly and explain why in a sentence or two, rather than leaving the panel to guess.
Quick check! Have you confirmed:
- Every question in the RFT has a response, even a short one explaining non-applicability?
- No section has been left blank on the assumption it’s not relevant?
Mistake 6: Assuming the lowest price will automatically win
Many businesses assume pricing aggressively is the safest way to win. In practice, most buyers evaluate on value for money, weighing price against quality, suitability, and total cost of ownership. Under-pricing without backing it up with genuine evidence can actually come across as a red flag about your understanding of scope, your ability to deliver sustainably, or your businesses financial stability.
How to fix it: Price to reflect real, sustainable delivery, and put at least as much effort into evidencing quality and reliability as you do into the number itself.
Quick check! Have you confirmed:
- Your price reflects your actual costs and margins, not a guess at undercutting competitors?
- You’ve explicitly addressed value, like quality, reliability, total cost of ownership, rather than assuming a low price speaks for itself?
- Your pricing is internally consistent throughout the document (no mismatches between the schedule and the narrative)?
Mistake 7: Missing the deadline, even by minutes
Late submissions are almost always rejected outright, with no exceptions, regardless of the reason. Portal slowdowns in the final hour before a deadline are common, particularly as multiple bidders rush to submit at once.
How to fix it: Treat the published deadline as a hard stop several hours earlier than the actual cut-off, and build in buffer for technical issues or last-minute executive sign-offs. At Tender Relief, we schedule our submissions to go in a full day before the official deadline. That might seem a lot of time to sacrifice, especially in a short tender open period, but a calm, peaceful, and error free submission is always worth it!
Quick check! Have you confirmed:
- You have a personal deadline set well ahead of the actual submission time?
- You know exactly how the portal or lodgement system works, and haven’t left your first attempt until the final hour?
- Any required internal sign-offs (pricing approval, director sign-off) are scheduled well before submission day?
Your Pre-Submission Checklist
Before you submit, it’s worth running through one last overall check. Make sure that:
- All mandatory compliance documents are current, attached, and match the RFT’s requirements
- Every criterion is answered directly, with evidence, in the right place
- Formatting (page limits, fonts, file type, naming) matches the RFT exactly
- No question has been left blank without an explanation
- Pricing reflects real, sustainable delivery and is backed by a clear value case
- Submission is planned well ahead of the deadline, with buffer for technical issues
- Content is tailored to this specific buyer and opportunity, not reused wholesale.
A Final Thought
It can feel awful to have a tender rejected, but most rejections aren’t a reflection on whether you or your business is good enough to do the work. Instead, they’re often a reflection on the submission preparation process, whether compliance requirements were met, criteria satisfied directly, and formatting checked carefully before it reached an evaluator.
Whether you’re bidding alongside running your business, carrying it solo as your organisation’s only tender professional, or refining an already capable team’s process, these are genuinely common stumbling blocks. Happily, they’re often also straightforward to put right!
If some of your recent tenders have been knocked out early but you’re not sure why, look over them using the checklists in this blog to see if these common mistakes are limiting your success.
Otherwise, if you’d prefer a set of impartial eyes and tailored analysis, get in touch with us about a post-submission review. Tender Relief will assess your recent submissions for compliance and quality against RFT requirements, and provide you with clear, practical advice that you can easily apply when preparing future responses. For tenders still in progress, we also offer pre-submission reviews to catch the simple, easily avoidable errors, as well as more complex gaps in evidence or positioning, long before your tender reaches an evaluator’s eye.